LL4 – Infrastructure

This point is for us, very straightforward: Select a lot that is within 1/2 mile of existing water service lines and sewer service lines. The intent for this point is that locating in places that already have utilities and roads reduces both the environmental impact...

LL3 – Preferred Locations

Similar to LL2 – Site Selection, this section awards points for the location of the home; this sub-section in particular encourages the building of LEED home near or within existing communities.  The idea here is that there is less environmental impact if people...

LL 2 – Site Selection

Welcome to the second section (out of eight) of the LEED for Homes Rating System! Wow, this sure is flying by. Location & Linkages has one path for Neighborhood Development, which is its own rating system designed for communities and developers — clearly not...

Solar Blip

As I have been patiently waiting for tenKsolar to get their UL listing so we can install our solar panels on our roof (the deadline is September 30th, 2010, or the Minnesota rebate expires), we have run into a bit of a blip.   Yesterday I received an email from the...